CHESTER CREEK FORCE MAIN
The 650 LF Chester Creek Force Main Relocation Project in Anchorage included the design of two 30” and 42” diameter sewer force mains located under the creek and in the Cook Inlet tidal zone. The installation of HDPE pipe using a “float and sink” method was utilized. The $1.4 million project was constructed in 2007.